Latest Streetworks meeting

The latest Streetworks meeting about removal of the Tulse Hill gyratory (one-way) system took place last Tuesday at City Heights Academy. A presentation was made by representatives of Streetworks, Tulse Hill Forum and Norwood Forum. This was followed by Transport for London giving a detailed presentation about the design process for the new road system. The presentations can be downloaded here and here or viewed below.